RFQ 2022-01
General Information:
The City of Goodland is hereby requesting statements of qualifications and experience (SOQ) from
qualified airport consultants for the proposed airport development projects at the Goodland
Municipal Airport. Subject to receipt of Federal funding under the FAA Airport Improvement
Program (AIP), Bipartisan Infrastructure Law (BIL) and/or KDOT Aviation Program (KAIP), the
projects may include the following:
- Acquire Snow Removal Equipment: Estimated cost $300,000
- Snow Removal Equipment Storage Facility: Estimated cost $250,000
The required services include preliminary design, final design, bidding, construction observation,
surveying, geotechnical investigation, equipment acquisition assistance, and environmental
analysis as it pertains to the airport development process.
The SOQ shall be limited to 20 pages of material (10 sheets, double sided), excluding front and
back covers, cover letter (limited to 1 sheet, double sided) and table of contents.
The projects and estimated costs shown above are identified in the Airport’s Capital Improvement
Program (CIP) prepared with assistance from EBH Engineering for the City of Goodland, Kansas. A
copy of the project CIP Data Sheet will be made available upon request.
A qualification based selection process conforming to FAA Advisory Circular 150/5100-14E will be
utilized to select the most qualified firm. Fee information will not be considered in the selection
process and should not be submitted with the statement of qualifications.
Selection criteria is listed in the attached document above.